Network Working Group J. Bouknight
Request for Comments: 156 26 April 1971
Category: G.5 Illinois
Obsoletes: None
Updates: None
Status of the Illinois Site (Response to RFC 0116)
As of the date of the report, 26 April, the Illinois Site has complete
operational hardware connecting the PDP-11 system with the IMP.
Due to much trouble with the Burroughs B6500 computer, final checkout
of the operating system plus the network control program for the
PDP-11 has been seriously curtailed. Current expectations are:
--checkout of the NCP by the latter part of May
--installation of the PDP-11 system in Paoli, PA (the operating
link between Illinois and Burroughs in Paoli) so that the system
will be operational during June
[ This RFC was put into machine readable form for entry ]
[ into the online RFC archives by Tom McGhan 7/97 ]
[Page 1]